Time Left : 00:00
A
8 degree
B
5 degree
C
6 degree
D
3 degree
A
Modulus of elasticity
B
Young`s Modulus
C
Modulus of resilience
D
Bulk Modulus
A
Law of conservation
B
Principle of moments
C
Newton`s second law
D
Archimede`s Principle
A
0 and 1000
B
4000 and 8000
C
2000 and 4000
D
1000 and 2000
A
Resource Allocation
B
Regularly monitoring the project condition
C
Preparation of detailed project plan
D
Cost/Benefit Analysis
A
Operating force
B
Middle Management
C
Lower Management
D
Top management
A
Angle between the tongue rail and Gauge face of the stock rail
B
Angle between the outer face of the stock rail and the gauge face of the tongue rail
C
Angle between the tongue rail and outer face of the stock rail
D
Angle between the outer face of the tongue rail and gauge face of the stock rail
A
It can manually be closing the pipes to control the flow of water
B
It controls the flow equally well from either direction
C
It offers less resistance to flow
D
It has quicker opening and closing
A
Subgrade to be compacted and prepared with a cross slope of 1 in 36
B
The top wearing course was made of smaller stones
C
Heavy foundation stones should be used above the soil subgrade
D
A semi-official technical body should be formed
A
Good hydraulic properties until it is filled
B
Maximum cross-sectional area for a given wall material can be used
C
Used for soft soil, because it is more stable
D
It gives higher velocity in low flow
A
Cast iron
B
Mild steel
C
Wrought iron
D
High Carbon Steel
A
Ultrasonic test
B
Torsion test
C
Eddy current test
D
Visual test
A
1. Date 2. Work order number 3. BOQ number 4. Location of work 5. Particulars
B
1. BOQ number 2. Date 3. Work order number 4. Location of work 5. Particulars
C
1. Date 2. BOQ number 3. Work order number 4. Location of work 5. Particulars
D
1. Date 2. BOQ number 3. Work order number 4. Particulars 5. Particulars
A
Cone of depression
B
Perched water table
C
Hypsometric curve
D
Piezometric surface
A
Training for Discharge
B
Low Water Training
C
Training for Depth
D
Training for Sediment
A
Flat bottom type cistern
B
Washdown toilet
C
Mechanical type cistern
D
The Bell type cistern
A
To ensure the comfort of people
B
To ensure the safety and comfort of people
C
To ensure the safety of people
D
Project economy
A
Trigonometric levelling
B
Spirit levelling
C
Direct levelling
D
Barometric levelling
A
depression
B
supercritical
C
critical
D
subcritical
A
1/30
B
30
C
27/1000
D
27