Explanation
<span>water conveyance</span>
Correct Answered :
Wrong Answered :
A
Water storage
B
Consumption use
C
Water use
D
water conveyance
<span>water conveyance</span>
Correct Answered :
Wrong Answered :
A
3
B
5
C
4
D
6
5
Correct Answered :
Wrong Answered :
A
Hydrophobic Cement
B
Portland Pozzolana cement
C
Coloured Cement
D
White cement
<span>Hydrophobic Cement</span>
Correct Answered :
Wrong Answered :
A
Pressure test
B
Impact test
C
Visual inspection
D
Sound test
<span>Pressure test</span>
Correct Answered :
Wrong Answered :
A
+6.22 N/mm^2
B
-12.64 N/mm^2
C
+12.64 N/mm^2
D
-6.22 N/mm^2
<span>-12.64 N/mm^2</span>
Correct Answered :
Wrong Answered :
A
Force concept
B
Load balancing cocept
C
stress concept
D
pressure concept
<span>Force concept</span>
Correct Answered :
Wrong Answered :
A
IS 4926:1976
B
IS 1199:1959
C
IS 516:1959
D
IS 10262:1982
IS 1199:1959<span></span>
Correct Answered :
Wrong Answered :
A
Collecting precise data
B
Setting out the work on the ground
C
Determinig the rough cost
D
Determining the feasibility of the area
<span>Setting out the work on the ground</span>
Correct Answered :
Wrong Answered :
A
squares, triangles and rectangles
B
squares and triangles
C
rectangles and squares
D
triangles and rectangles
<span>triangles and rectangles</span>
Correct Answered :
Wrong Answered :
A
4.3 m
B
0.33 m
C
3.3 m
D
3 m
<span>3.3 m</span>
Correct Answered :
Wrong Answered :