JE Civil 27 Oct 2021 (Shift 2) Examination MCQs with solutions

1. Select the INCORRECT

A

Retarding admixtures decrease the initial setting time of concrete

B

Damp-proofing admixtures can act as accelerators at the initial stage of the hardening of concrete

C

Air entraining admixtures prevent the segregation and bleeding phenomenon in concrete

D

Pozzolanic admixtures decrease the possibility of thermal shrinkage in concrete

Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: A
Explanation

Retarding admixtures decrease the initial setting time of concrete 

Correct Answered :

Wrong Answered :

2. Which of the following traverse adjusting methods is employed for angular measurements?

A

Transit method

B

Graphical method

C

Bowditch`s method

D

Axis method

General Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: A
Explanation

Option A is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

3. When perimeter is less than time, discharge is:

A

Same

B

More

C

Less

D

Zero

General Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: B
Explanation

Option B is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

4. Select an INCORRECT statement for the workability of concrete. 

A

The workability of concrete is mainly affected by the water-cement ratio and aggregate-cement ratio.

B

The compaction factor for the concrete of very low workability is 0.78.

C

Concrete ball test is a sample laboratory test

D

Slump test of workability gives good results for the rich mix concrete.

Concrete Technology JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: C
Explanation

Option C is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

5. In two lane state highway with bituminous concrete of 7.5 m width, what should be the height of the crown with respect to the edges assuming straight line camber of 1 in 50 slope?

A

0.075 m

B

0.095 m

C

0.065 m

D

0.085 m

Concrete Technology JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: A
Explanation

Total quality cost is the sum of prevention, appraisal and failure costs.

Correct Answered :

Wrong Answered :

6. The immediate predecessors of activity D are A, B, and C. Given the earliest finish time of activity A, B and C are respectively 10, 12 and 16 days, the earliest start time of activity D will be:

A

10 days

B

12 days

C

38 days

D

16 days

General Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: D
Explanation

Option D is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

7. The thermostat of the geyser, fail to ______ at set temp 65 - 70oC.

A

pressure relief valve

B

air relief

C

gate valve

D

cut off

General Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: D
Explanation

Option D is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

8. In the Squatting Type of Water Closet, the pan is fitted with P-trap or S-trap and then connected to the _________.

A

Siphonage pipe

B

Soil pipe

C

PVC pipe

D

Galvanized Steel pipe

General Civil Engineering JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: B
Explanation

Option B is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :

9. What is minimum Specific surface area of Ordinary Portland Cement (in cm2/gm)?

A

2000

B

2250

C

3200

D

3250

Concrete Technology JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: B
Explanation

Minimum specific surface for OPC is 2250 cm?/g ensuring fineness.

Correct Answered :

Wrong Answered :

10. The tensile strength in MPa of a good quality hardened and tempered steel wire chain pins is __________.

A

600

B

700

C

500

D

800

Surveying JE Civil 27 Oct 2021 (Shift 2) REPORT
Correct Answer: B
Explanation

Option B is correct as per standard civil engineering principle.

Correct Answered :

Wrong Answered :